nav emailalert searchbtn searchbox tablepage yinyongbenwen piczone journalimg journalInfo journalinfonormal searchdiv searchzone qikanlogo popupnotification paper paperNew
2026, 01, v.53 56-65
考虑配电网结构演化的光储充柔性互联规划方法
基金项目(Foundation): 国网山东省电力公司科技项目(520611240005)~~
邮箱(Email): houchenghao2024@163.com;
DOI: 10.20097/j.cnki.issn1007-9904.240508
摘要:

随着电动汽车(electric vehicles,EVs)的不断普及,含光储的快速充电站逐渐成为配电网的重要负荷类型,光储充一体的快速充电站的运行状态将影响配电网的运行状态。本文针对光储充接入的配电网问题,通过柔性互联配合储能实现配电网的潮流分布的调整,提出了一种考虑配电网结构演化的光储充柔性互联规划方法。本方法分成两层实现规划,上层基于蒙特卡洛模拟实现配电网结构演化的模拟,下层以配电网的运行成本为优化目标实现柔性互联装置的规划。首先,以快速充电站(fast charging station,FCS)、储能(energy storage,ES)和软开关(soft open point,SOP)为研究对象,建立快速充电站充电负荷模型,建立储能充放电模型,建立SOP互联装置功率交互模型。其次,考虑配电网的负荷需求,构建基于节点度和联络距离的配电网结构演化概率模型。再次,建立以配电网运行费用为优化目标的SOP柔性互联规划模型,进而构建双层求解算法,上层算法基于蒙特卡洛模拟实现配电网结构演化的模拟,从而确定配电网的演化结构;下层算法基于上层演化结构,考虑充电负荷、储能的充放电情况和SOP的功率交互情况,对SOP的柔性互联位置做出规划。最后,基于IEEE 33节点算例,对本文所提方法进行了验证,仿真结果表明,当采用本文所提方法时,配电网的运行成本、有功网损和电压越限情况得到了改善。

Abstract:

With the continuous popularization of electric vehicles(EVs),fast charging stations(FCSs)integrated with photovoltaic and energy storage gradually become an important load type of the distribution network.The operation status of integrated FCSs with photovoltaic energy storage and charging will affect the operation status of the distribution network.Aiming at the problem of the distribution network,this paper realizes the adjustment of the power flow distribution of the distribution network through flexible interconnection in cooperation with energy storage.And a flexible interconnection planning method is proposed for photovoltaic,energy storage and charging considering the structural evolution of the distribution network.This method realizes the planning in two layers.The upper layer realizes the simulation of the structural evolution of the distribution network based on Monte Carlo simulation. And the lower layer realizes the planning of the flexible interconnection device with the operation cost of the distribution network as the optimization objective.Firstly,taking the FCS,energy storage(ES)and soft open point(SOP)as the research objects,a charging load model of the FCS,a charging and discharging model of the energy storage,and a power interaction model of the SOP interconnection device are established.Secondly,considering the load demand of the distribution network,a probability model of the structural evolution of the distribution network based on the node degree and the connection distance is constructed. Thirdly,an SOP flexible interconnection planning model with the operation cost of the distribution network as the optimization objective is established.Then a two-layer solution algorithm is constructed.The upper-layer algorithm realizes the simulation of the structural evolution of the distribution network based on Monte Carlo simulation,so as to determine the evolution structure of the distribution network.The lower-layer algorithm makes a plan for the flexible interconnection location of the SOP based on the upper-layer evolution structure,taking into account the charging load,the charging and discharging conditions of the energy storage,and the power interaction conditions of the SOP. Finally,the method proposed in this paper is verified based on the 33-node system.The simulation results show that when the proposed method in this paper is adopted,the operation cost,active power loss and voltage violation situation of the distribution network are improved.

参考文献

[1]陈立阳,兰征,何东,等.光储快充站直流接入的FIDN及其功率协调控制策略[J].智慧电力,2025,53(3):1-8.CHEN Liyang,LAN Zheng,HE Dong,et al.FIDN with DC access of photovoltaic-energy storage fast-charging stations and its power coordination control strategy[J].Smart Power,2025,53(3):1-8.

[2]陈炯,吴文清,李豪,等.独立光储微电网控制策略研究[J].中国电力,2025,58(5):74-81,198.CHEN Jiong,WU Wenqing,LI Hao,et al. Research on control strategy of independent micro-grid with photovoltaic energy storage[J].Electric Power,2025,58(5):74-81,198.

[3]SALEHPOUR M J,MOGHADDAS TAFRESHI S M.The effect of price responsive loads uncertainty on the risk-constrained optimal operation of a smart micro-grid[J]. International Journal of Electrical Power&Energy Systems,2019,106:546-560.

[4]王伟.光储充智慧充电站及其能量调度优化研究[D].武汉:武汉理工大学,2021.

[5]高昇宇,柳志航,卫志农,等.城市智能光储充电塔自适应鲁棒日前优化调度[J].电力系统自动化,2019,43(20):39-48.GAO Shengyu,LIU Zhihang,WEI Zhinong,et al.Adaptive robust day-ahead optimal dispatch for urban smart photovoltaic storage and charging tower[J]. Automation of Electric Power Systems,2019,43(20):39-48.

[6]郭子瑶.光伏型电动汽车充电站实时能量管理策略研究[D].哈尔滨:哈尔滨工业大学,2021.

[7]蒋甜甜.基于需求响应的光储充一体化系统多目标优化运行研究[D].郑州:郑州大学,2020.

[8]汝改革.基于需求响应的电动汽车充电站优化运行研究[D].芜湖:安徽工程大学,2019.

[9]王一清,苏岭东,顾捷,等.计及电动汽车充电需求的城市配电网多场景低碳优化调度研究[J].水利水电技术(中英文),2024,55(7):32-44.WANG Yiqing,SU Lingdong,GU Jie,et al. Multi-scenario lowcarbon optimization scheduling study for urban distribution networks considering electric vehicle charging demand[J]. Water Resources and Hydropower Engineering,2024,55(7):32-44.

[10]孙丛丛.基于自动需求响应的微电网源储荷协调优化控制策略研究[D].上海:上海电机学院, 2018.

[11]EHSANBAKHSH M,SEPASIAN M S. Simultaneous siting and sizing of Soft Open Points and the allocation of Tie switches in active distribution network considering network reconfiguration[J].IET Generation,Transmission&Distribution,2023,17(1):263-280.

[12]YANG Z C,YANG F,MIN H D,et al.A local control strategy for voltage fluctuation suppression in a flexible interconnected distribution station area based on soft open point[J].Sustainability,2023,15(5):4424.

[13]KAMEL T,TIAN Z B,ZANGIABADI M,et al. Smart soft open point to synergically improve the energy efficiencies of the interconnected electrical railways with the low voltage grids[J].International Journal of Electrical Power&Energy Systems,2022,142:108288.

[14]王成山,季节,冀浩然,等.配电系统智能软开关技术及应用[J].电力系统自动化,2022,46(4):1-14.WANG Chengshan,JI Jie,JI Haoran,et al. Technologies and application of soft open points in distribution networks[J].Automation of Electric Power Systems,2022,46(4):1-14.

[15]李子晨,米阳,韩云昊,等.含智能软开关与移动储能的两阶段配电网韧性提升策略[J].上海电力大学学报,2024,40(3):198-205.LI Zichen,MI Yang,HAN Yunhao,et al. Two-stage distribution network resilience improvement strategy including soft open point and mobile energy storage[J]. Journal of Shanghai University of Electric Power,2024,40(3):198-205.

[16]赵一奇,郭力,刘一欣,等.计及阻塞管理的交直流柔性配电网协调优化调度方法[J].电网技术,2021,45(2):622-633.ZHAO Yiqi,GUO Li,LIU Yixin,et al. Coordinated optimal scheduling method of AC/DC flexible distribution network considering congestion management[J].Power System Technology,2021,45(2):622-633.

[17]邓正东,朱晓丽,段军鹏,等.基于动态权重的柔性互联配电网自适应优化调度[J/OL].电力建设,2024:1-11[2024-12-01].https:??kns.cnki.net/kcms/detail/11.2583.tm.20241031.1649.004.html.DENG Zhengdong,ZHU Xiaoli,DUAN Junpeng,et al. Adaptive optimal dispatching of flexible interconnected distribution System based on dynamic weight[J/OL]. Electric Power Construction,2024:1-11[2024-12-01].https:??kns.cnki.net/kcms/detail/11.2583.tm.20241031.1649.004.html.

[18]赵晶晶,李梓博,刘帅,等.考虑智能软开关电压支撑的城市配电网弹性提升方法[J].电力建设,2023,44(7):77-86.ZHAO Jingjing,LI Zibo,LIU Shuai,et al.Resilience lifting method of urban distribution network considering soft open point voltage support[J].Electric Power Construction,2023,44(7):77-86.

[19]ZHAO Y D,XIONG W,YUAN X F,et al.A fault recovery strategy of flexible interconnected distribution network with SOP flexible closed-loop operation[J].International Journal of Electrical Power&Energy Systems,2022,142:108360.

[20]喻希,杨杉,兰征,等.基于储能型智能软开关联合网络重构的配电网供电恢复策略[J].湖南工业大学学报,2025,39(1):35-42.YU Xi,YANG Shan,LAN Zheng,et al. Power supply restoration strategy for distribution with integrated network reconstruction based on energy storage intelligent soft switches[J]. Journal of Hunan University of Technology,2025,39(1):35-42.

[21]刘桄志,庞丹,葛津铭,等.计及光储接入场景下的柔性互联系统多模式优化运行[J].电网与清洁能源,2024,40(6):1-10.LIU Guangzhi,PANG Dan,GE Jinming,et al. The multi-mode optimization operation of the flexible interconnection system considering the photovoltaic and energy storage access scenarios[J].Power System and Clean Energy,2024,40(6):1-10.

[22]XIAO H,PEI W,DENG W,et al.Enhancing risk control ability of distribution network for improved renewable energy integration through flexible DC interconnection[J]. Applied Energy,2021,284:116387.

[23]HUO Q H,WANG W Y,YANG Y H,et al. Research on the application of SOP in multi-station integrated system[J].Frontiers in Energy Research,2021,9:630234.

[24]YAN X W,WANG Q G,BU J Y. High penetration PV active distribution network power flow optimization and loss reduction based on flexible interconnection technology[J]. Electric Power Systems Research,2024,226:109839.

[25]JIA Y X,LI Q,LIAO X,et al.Research on the access planning of SOP and ESS in distribution network based on SOCP-SSGA[J].Processes,2023,11(6):1844.

[26]宋亮,邢志同,毛晨旭,等.基于智能光储软开关的柔性有源配电网潮流优化[J].山东电力技术,2024,51(6):36-42.SONG Liang,XING Zhitong,MAO Chenxu,et al. Power flow optimization of flexible active distribution network based on photovoltaic-energy storage SNOP[J].Shandong Electric Power,2024,51(6):36-42.

基本信息:

DOI:10.20097/j.cnki.issn1007-9904.240508

中图分类号:U491.8;TM715

引用信息:

[1]候承昊,闫鹏飞,王启民,等.考虑配电网结构演化的光储充柔性互联规划方法[J].山东电力技术,2026,53(01):56-65.DOI:10.20097/j.cnki.issn1007-9904.240508.

基金信息:

国网山东省电力公司科技项目(520611240005)~~

发布时间:

2026-01-25

出版时间:

2026-01-25

检 索 高级检索

引用

GB/T 7714-2015 格式引文
MLA格式引文
APA格式引文